{"id":5403,"date":"2026-11-18T03:54:49","date_gmt":"2026-11-18T02:54:49","guid":{"rendered":"https:\/\/www.ondara.group\/loan-to-cost-ltc-explained\/"},"modified":"2026-11-18T03:54:49","modified_gmt":"2026-11-18T02:54:49","slug":"loan-to-cost-ltc-explained","status":"publish","type":"post","link":"https:\/\/www.ondara.group\/en\/loan-to-cost-ltc-explained\/","title":{"rendered":"Loan to cost (LTC): what it is and how to calculate it"},"content":{"rendered":"<p><strong>Loan to cost (LTC) is the share of a real estate development&#8217;s total cost that is financed with debt: you divide the loan amount by the project cost (land, construction, fees, permits, taxes and finance costs). If a scheme costs EUR 8 million and the loan is EUR 5.6 million, the LTC is 70%. For an investor in private real estate debt it is one of the first figures to check, because it shows how much of their own money the developer puts at risk ahead of the lender.<\/strong><\/p>\n<h2>What loan to cost is and why it is used in development<\/h2>\n<p>In a development, the asset does not exist yet: there is a plot, a project and a budget. That is why lenders measure the loan against what it <em>costs<\/em> to build, not only against what the finished building <em>will be worth<\/em>.<\/p>\n<p>The formula is simple:<\/p>\n<p><strong>LTC = loan amount \/ total project cost \u00d7 100<\/strong><\/p>\n<p>Defining the denominator properly is the hard part. Total cost usually includes:<\/p>\n<ul>\n<li><strong>Land<\/strong>: purchase price and acquisition costs.<\/li>\n<li><strong>Hard costs<\/strong>: the construction works, based on the budget and the building contract.<\/li>\n<li><strong>Soft costs<\/strong>: design and site supervision, permits and fees, insurance, marketing and management.<\/li>\n<li><strong>Finance costs<\/strong>: interest and fees during construction, which are sometimes included and sometimes not.<\/li>\n<li><strong>Contingency<\/strong>: a buffer for unforeseen costs, usually a percentage of the construction budget.<\/li>\n<\/ul>\n<p>The difference between total cost and the loan is the <strong>equity<\/strong> of the developer and its partners. The lower the LTC, the larger that cushion, which is the first to absorb losses if something goes wrong.<\/p>\n<h2>LTC vs LTV: the difference<\/h2>\n<p>The two ratios answer different questions. LTC asks how much the developer has put in; LTV (loan to value) asks how much headroom there is between the debt and the value of the asset. In development, LTV is often measured against the appraised value of the completed scheme, known as gross development value (GDV).<\/p>\n<div class=\"tabla-seo\">\n<table>\n<caption>Source: Ondara Group analysis, November 2026<\/caption>\n<thead>\n<tr>\n<th>Aspect<\/th>\n<th>Loan to cost (LTC)<\/th>\n<th>Loan to value (LTV)<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Denominator<\/td>\n<td>Total project cost<\/td>\n<td>Appraised value (current or on completion)<\/td>\n<\/tr>\n<tr>\n<td>What it measures<\/td>\n<td>Equity the developer has at risk<\/td>\n<td>Headroom between debt and asset value<\/td>\n<\/tr>\n<tr>\n<td>Most used for<\/td>\n<td>Land purchase, new build, refurbishment<\/td>\n<td>Completed assets and development<\/td>\n<\/tr>\n<tr>\n<td>Weak point<\/td>\n<td>Relies on a realistic budget<\/td>\n<td>Relies on the valuation and on prices<\/td>\n<\/tr>\n<tr>\n<td>Warning sign<\/td>\n<td>Little equity or understated costs<\/td>\n<td>Optimistic end-value appraisals<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>A sound analysis looks at both. A low LTC with a high LTV may signal a prudent end value or a thin development margin. A high LTC with a low LTV may signal a wide margin&#8230; or an overly optimistic valuation.<\/p>\n<h2>Trends: what is happening worldwide and in Spain<\/h2>\n<ul>\n<li><strong>More scrutiny of private credit lending standards (US).<\/strong> On <a href=\"https:\/\/www.newyorkfed.org\/newsevents\/news\/markets\/2026\/20261109\" target=\"_blank\" rel=\"noopener\">9 November 2026 the Federal Reserve Banks of Dallas and New York opened a pilot survey<\/a> of direct lenders to track how their lending standards are changing. Aggregate results are due in the first quarter of 2027.<\/li>\n<li><strong>Financial Stability Board warning (global).<\/strong> Its chair, Bank of England Governor Andrew Bailey, warned in mid-November 2026 that private credit could become a systemic risk before it reaches systemic size, because of interconnections and information gaps.<\/li>\n<li><strong>New homes gain weight in sales (Spain).<\/strong> According to the <a href=\"https:\/\/www.ine.es\/dyngs\/Prensa\/en\/ETDP0826.htm\" target=\"_blank\" rel=\"noopener\">property transfer statistics released by INE (Spain&#8217;s statistics office) on 26 October 2026<\/a>, 49,319 home sales were registered in August (+3.4% year on year), of which 10,521 were new homes (+4.9%). The data are provisional. Demand for new housing is there; the challenge is to fund construction with prudent structures.<\/li>\n<li><strong>Market terms in alternative lending (Spain).<\/strong> The Observatory of Alternative Financing with Mortgage Collateral in Spain, with market analysis by PwC and legal framework by Cuatrecasas, puts the average LTV of alternative debt at 55%, within a 30% to 68% range, in 2025. We summarise it in our article on <a href=\"https:\/\/www.ondara.group\/en\/alternative-mortgage-lending-spain-2026\/\">alternative mortgage lending in Spain in 2026<\/a>.<\/li>\n<\/ul>\n<h2>How to calculate LTC: an illustrative example<\/h2>\n<p><img data-dominant-color=\"767874\" data-has-transparency=\"false\" style=\"--dominant-color: #767874;\" decoding=\"async\" src=\"https:\/\/www.ondara.group\/wp-content\/uploads\/2026\/11\/calculo-loan-to-cost-presupuesto-obra.webp\" alt=\"Architectural plans and drafting tools used to calculate the loan to cost of a development from its construction budget\" width=\"1680\" height=\"1130\" class=\"aligncenter size-full wp-image-5399 not-transparent\" loading=\"lazy\" srcset=\"https:\/\/www.ondara.group\/wp-content\/uploads\/2026\/11\/calculo-loan-to-cost-presupuesto-obra-200x135.webp 200w, https:\/\/www.ondara.group\/wp-content\/uploads\/2026\/11\/calculo-loan-to-cost-presupuesto-obra-300x202.webp 300w, https:\/\/www.ondara.group\/wp-content\/uploads\/2026\/11\/calculo-loan-to-cost-presupuesto-obra-400x269.webp 400w, https:\/\/www.ondara.group\/wp-content\/uploads\/2026\/11\/calculo-loan-to-cost-presupuesto-obra-600x404.webp 600w, https:\/\/www.ondara.group\/wp-content\/uploads\/2026\/11\/calculo-loan-to-cost-presupuesto-obra-768x517.webp 768w, https:\/\/www.ondara.group\/wp-content\/uploads\/2026\/11\/calculo-loan-to-cost-presupuesto-obra-800x538.webp 800w, https:\/\/www.ondara.group\/wp-content\/uploads\/2026\/11\/calculo-loan-to-cost-presupuesto-obra-1024x689.webp 1024w, https:\/\/www.ondara.group\/wp-content\/uploads\/2026\/11\/calculo-loan-to-cost-presupuesto-obra-1200x807.webp 1200w, https:\/\/www.ondara.group\/wp-content\/uploads\/2026\/11\/calculo-loan-to-cost-presupuesto-obra-1536x1033.webp 1536w, https:\/\/www.ondara.group\/wp-content\/uploads\/2026\/11\/calculo-loan-to-cost-presupuesto-obra.webp 1680w\" sizes=\"auto, (max-width: 1680px) 100vw, 1680px\" \/><\/p>\n<p>Here is an <strong>illustrative and hypothetical example<\/strong>. A residential scheme has a total cost of EUR 8,000,000: EUR 2,000,000 of land, EUR 5,200,000 of construction and EUR 800,000 of soft costs. The estimated value of the completed homes is EUR 10,000,000. We compare three levels of debt.<\/p>\n<div class=\"tabla-seo\">\n<table>\n<caption>Illustrative example prepared by Ondara Group, November 2026<\/caption>\n<thead>\n<tr>\n<th>LTC<\/th>\n<th>Loan<\/th>\n<th>Equity<\/th>\n<th>LTV on end value<\/th>\n<th>End-value fall still covering principal<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>60%<\/td>\n<td>EUR 4,800,000<\/td>\n<td>EUR 3,200,000<\/td>\n<td>48%<\/td>\n<td>52%<\/td>\n<\/tr>\n<tr>\n<td>70%<\/td>\n<td>EUR 5,600,000<\/td>\n<td>EUR 2,400,000<\/td>\n<td>56%<\/td>\n<td>44%<\/td>\n<\/tr>\n<tr>\n<td>80%<\/td>\n<td>EUR 6,400,000<\/td>\n<td>EUR 1,600,000<\/td>\n<td>64%<\/td>\n<td>36%<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>The last column shows how far the end value could fall before it no longer repaid the loan principal. It is a simplification: it ignores interest, sales costs, delays and legal costs, which in practice reduce that headroom.<\/p>\n<p>The key point: at 80% LTC the developer has half the equity at risk compared with 60% LTC, and the lender&#8217;s cushion narrows visibly.<\/p>\n<h3>What happens with cost overruns<\/h3>\n<p>In the same illustrative example, suppose construction costs rise by 10% (EUR 520,000). If the overrun is funded with more debt, the effective LTC rises from 70% to 71.8%. If the developer funds it, they need 21.7% more equity. In the 80% scenario, the extra effort would be 32.5% of the initial equity. That is why overruns are a common source of stress in developments, as we explain in our article on <a href=\"https:\/\/www.ondara.group\/en\/construction-cost-overruns-development\/\">construction cost overruns in development<\/a>.<\/p>\n<h2>What LTC is reasonable and what else to check<\/h2>\n<p>There is no single &#8220;right&#8221; LTC. It depends on the project stage, asset type, location, pre-sales and the developer&#8217;s track record. As a general rule, financing unpermitted land is done at lower levels than financing construction with permits and pre-sales, because the risk is higher. See also our article on the <a href=\"https:\/\/www.ondara.group\/en\/alternative-development-loan-spain\/\">alternative development loan in Spain<\/a>.<\/p>\n<p>Beyond the headline figure, check:<\/p>\n<ul>\n<li><strong>Budget quality<\/strong>: fixed-price or open contract, contingency and who bears overruns.<\/li>\n<li><strong>Source of equity<\/strong>: whether it is real cash or land &#8220;contributed&#8221; at a revalued price. LTC on historical cost and on current value can differ widely.<\/li>\n<li><strong>Drawdowns by milestone<\/strong>: the loan should be released as works progress, certified by an independent surveyor.<\/li>\n<li><strong>Ranking<\/strong>: if there is mezzanine debt or shareholder loans, total LTC can be higher than the senior tranche&#8217;s. Our article on <a href=\"https:\/\/www.ondara.group\/en\/real-estate-development-equity-spain\/\">real estate development equity in Spain<\/a> explains the layer below.<\/li>\n<li><strong>Exit plan<\/strong>: sales, pre-sales or refinancing, and what happens if they are delayed.<\/li>\n<\/ul>\n<h2>Risks to consider<\/h2>\n<p>Investing in development debt carries risks that a prudent LTC reduces but does not remove:<\/p>\n<ul>\n<li><strong>Default risk<\/strong>: the developer may fail to repay on time or in full, which may mean partial or total loss of the capital invested.<\/li>\n<li><strong>Construction risk<\/strong>: delays, overruns or contractor problems can consume the equity cushion.<\/li>\n<li><strong>Market risk<\/strong>: if prices or sales pace worsen, the end value may not cover the debt.<\/li>\n<li><strong>Illiquidity and term risk<\/strong>: capital is tied up until maturity, and enforcing the collateral can delay recovery considerably.<\/li>\n<li><strong>Information risk<\/strong>: a weak budget or valuation makes LTC and LTV look better than they are.<\/li>\n<\/ul>\n<p>Real estate collateral mitigates risk, but it does not eliminate it.<\/p>\n<h2>How we analyse it at Ondara Group<\/h2>\n<p>Since 2018, <a href=\"https:\/\/www.ondara.group\/en\/who-we-are\/\">Ondara Group<\/a> has structured private debt transactions secured by real assets. For each transaction we analyse the project&#8217;s cost and value, the developer&#8217;s equity, the robustness of the budget and the exit plan, and we explain them to the investor before they decide. We aim to diversify across transactions and keep direct contact with the management team. The minimum investment is EUR 25,000. Ondara targets double-digit returns, always as a target and never guaranteed.<\/p>\n<h2>Frequently asked questions<\/h2>\n<h3>What does loan to cost mean?<\/h3>\n<p>It is the ratio between the loan amount and the total cost of a real estate project, expressed as a percentage.<\/p>\n<h3>How is LTC calculated?<\/h3>\n<p>Divide the loan by total cost (land, construction, soft costs and, depending on the case, finance costs and contingency) and multiply by 100. A EUR 5.6 million loan on a EUR 8 million cost gives a 70% LTC.<\/p>\n<h3>What is the difference between LTC and LTV?<\/h3>\n<p>LTC compares debt with what the project costs; LTV compares it with what the asset is worth according to a valuation. Both are used in development.<\/p>\n<h3>Does a low LTC remove the risk?<\/h3>\n<p>No. A low LTC means more developer equity ranks ahead of the lender, but default, construction, market and illiquidity risks remain, including the possible loss of capital.<\/p>\n<h3>What is Ondara&#8217;s minimum investment?<\/h3>\n<p>EUR 25,000. Before you invest, we explain each transaction, its risks and its term.<\/p>\n<h2>In summary<\/h2>\n<ul>\n<li>LTC measures what share of a development&#8217;s cost is financed with debt and, by difference, how much equity the developer risks.<\/li>\n<li>It complements LTV: one looks at cost, the other at value.<\/li>\n<li>A higher LTC leaves less cushion against overruns or price falls, as the illustrative example shows.<\/li>\n<li>No ratio removes risk: budget, developer, collateral and exit all need analysing.<\/li>\n<\/ul>\n<p>If you would like to know how we invest, <strong><a href=\"https:\/\/www.ondara.group\/en\/investors\/\">register as an investor<\/a><\/strong> and we will explain how it works. The minimum investment is EUR 25,000.<\/p>\n<p><em>This article is for information purposes only and does not constitute an investment recommendation or financial advice. All investments carry risks, including the possible loss of the capital invested, and past or target returns do not guarantee future returns. Analyse each opportunity with a professional before investing.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>What loan to cost (LTC) means, how to calculate it, how it differs from LTV and what investors in development debt should check. With an illustrative example.<\/p>\n","protected":false},"author":1,"featured_media":5396,"comment_status":"","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[21,24],"tags":[],"class_list":["post-5403","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-direct-lending","category-real-estate"],"_links":{"self":[{"href":"https:\/\/www.ondara.group\/en\/wp-json\/wp\/v2\/posts\/5403","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ondara.group\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ondara.group\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ondara.group\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ondara.group\/en\/wp-json\/wp\/v2\/comments?post=5403"}],"version-history":[{"count":0,"href":"https:\/\/www.ondara.group\/en\/wp-json\/wp\/v2\/posts\/5403\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ondara.group\/en\/wp-json\/wp\/v2\/media\/5396"}],"wp:attachment":[{"href":"https:\/\/www.ondara.group\/en\/wp-json\/wp\/v2\/media?parent=5403"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ondara.group\/en\/wp-json\/wp\/v2\/categories?post=5403"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ondara.group\/en\/wp-json\/wp\/v2\/tags?post=5403"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}