{"id":5350,"date":"2026-11-16T03:56:42","date_gmt":"2026-11-16T02:56:42","guid":{"rendered":"https:\/\/www.ondara.group\/construction-cost-overruns-development\/"},"modified":"2026-11-16T03:56:42","modified_gmt":"2026-11-16T02:56:42","slug":"construction-cost-overruns-development","status":"publish","type":"post","link":"https:\/\/www.ondara.group\/en\/construction-cost-overruns-development\/","title":{"rendered":"Construction cost overruns in development: 2026 guide"},"content":{"rendered":"<p><strong>Construction cost overruns in a real estate development are the gap between the budgeted cost of building and what it finally costs to complete the project. For anyone investing in the debt or equity of that development, they are one of the most important risks: they eat into the developer&#8217;s margin, can leave the agreed financing short and usually come with delays.<\/strong> In 2026 the issue is back on the table because construction costs in Spain keep rising faster than general inflation.<\/p>\n<p>This article explains where overruns come from, how they are shared between developer, lender and investor, what the latest data say and which questions are worth asking before investing in a development deal.<\/p>\n<h2>What construction cost overruns are and why they matter to investors<\/h2>\n<p>Every development starts with a budget: land, construction, professional fees, permits, taxes, marketing and finance costs. Construction is usually the largest line and the hardest to pin down, because it is carried out over 18-30 months and depends on materials, labour, subcontractors and administrative timelines.<\/p>\n<p>When the works cost more than planned, someone has to fund the difference. In practice, the usual order is:<\/p>\n<ol>\n<li><strong>The contingency line<\/strong> in the budget itself (a buffer that is often around 5% of construction cost).<\/li>\n<li><strong>The developer&#8217;s own equity<\/strong>, either by injecting more capital or by giving up part of the margin.<\/li>\n<li><strong>The lender<\/strong>, if it agrees to increase the loan, normally in exchange for more security or a higher rate.<\/li>\n<li>If none of the above works, the project stalls or is delayed, and the risk then depends on the value of the collateral and the ability to complete the building.<\/li>\n<\/ol>\n<p>For a debt investor, the key point is that the loan is sized on total cost (loan to cost, LTC) and on value (loan to value, LTV). If costs rise and nobody funds the gap, the loan is no longer enough to finish the works, and a half-built property is worth considerably less than a completed one.<\/p>\n<h2>Trends: what is happening worldwide and in Spain<\/h2>\n<ul>\n<li><strong>Spain, labour costs (INE, 17 September 2026).<\/strong> According to the <a href=\"https:\/\/www.ine.es\/dyngs\/Prensa\/en\/ETCL2T26.htm\" target=\"_blank\" rel=\"noopener\">Quarterly Labour Cost Survey for Q2<\/a> published by INE (Spain&#8217;s national statistics office), labour cost per worker per month in construction reached EUR 3,447.94, up 5.0% year on year, compared with 4.0% for the economy as a whole. The shortage of skilled labour keeps pushing costs up.<\/li>\n<li><strong>Spain, cost of building homes (July 2026).<\/strong> An analysis published by idealista using data from APCE (the developers&#8217; and builders&#8217; association of Catalonia) puts the cost of building housing 25.1% above 2019 levels. The 43 materials studied rose by 26.7% between 2019 and 2025, against 18.3% for the consumer price index, and structural works are up 39.8%. In Catalonia, the cost of a multi-family building stood at EUR 1,644.78 per square metre in 2025.<\/li>\n<li><strong>Spain, medium-term view (October 2026).<\/strong> The <a href=\"https:\/\/www.pwc.es\/es\/real-estate\/observatorio-financiacion-alternativa-colateral-hipotecario-espana.html\" target=\"_blank\" rel=\"noopener\">Observatory of Alternative Financing with Mortgage Collateral in Spain, with market analysis by PwC and legal framework by Cuatrecasas<\/a>, reports that construction costs rose by 48.3% between 2018 and 2025, that construction employment fell from 2.5 million in 2008 to 1.5 million in 2024 and that 90% of projects are not completed on time. The figures differ from those above because they cover different periods and cost lines; the direction is the same.<\/li>\n<li><strong>Global, private credit defaults (Fitch, late October 2026).<\/strong> Fitch put the US private credit default rate at 6.3% for the twelve months to the third quarter, the highest in its series, up from 6.0% in the previous quarter, as <a href=\"https:\/\/inforcapital.com\/news\/private-credit-defaults-hit-record-63-in-q3-fitch\/\" target=\"_blank\" rel=\"noopener\">reported by the specialist press<\/a>. Among the causes it cites stressed maturities and harder refinancing. It is not a Spanish real estate figure, but it is a reminder that when margins tighten, deal-by-deal analysis matters more than volume.<\/li>\n<\/ul>\n<p>What it means for private investors: with costs growing faster than inflation, construction budgets drawn up one or two years ago may fall short. This does not rule out investing in development, but it does require a close look at the budget, the construction contract and the buffer in each deal.<\/p>\n<h2>How overruns affect a development: an illustrative example<\/h2>\n<p><img data-dominant-color=\"756f6a\" data-has-transparency=\"false\" style=\"--dominant-color: #756f6a;\" decoding=\"async\" src=\"https:\/\/www.ondara.group\/wp-content\/uploads\/2026\/11\/costes-construccion-obra-nueva-2026.webp\" alt=\"Building site with formwork and crane: construction costs and cost overruns in 2026\" width=\"1680\" height=\"945\" class=\"aligncenter size-full wp-image-5346 not-transparent\" loading=\"lazy\" srcset=\"https:\/\/www.ondara.group\/wp-content\/uploads\/2026\/11\/costes-construccion-obra-nueva-2026-200x113.webp 200w, https:\/\/www.ondara.group\/wp-content\/uploads\/2026\/11\/costes-construccion-obra-nueva-2026-300x169.webp 300w, https:\/\/www.ondara.group\/wp-content\/uploads\/2026\/11\/costes-construccion-obra-nueva-2026-400x225.webp 400w, https:\/\/www.ondara.group\/wp-content\/uploads\/2026\/11\/costes-construccion-obra-nueva-2026-600x338.webp 600w, https:\/\/www.ondara.group\/wp-content\/uploads\/2026\/11\/costes-construccion-obra-nueva-2026-768x432.webp 768w, https:\/\/www.ondara.group\/wp-content\/uploads\/2026\/11\/costes-construccion-obra-nueva-2026-800x450.webp 800w, https:\/\/www.ondara.group\/wp-content\/uploads\/2026\/11\/costes-construccion-obra-nueva-2026-1024x576.webp 1024w, https:\/\/www.ondara.group\/wp-content\/uploads\/2026\/11\/costes-construccion-obra-nueva-2026-1200x675.webp 1200w, https:\/\/www.ondara.group\/wp-content\/uploads\/2026\/11\/costes-construccion-obra-nueva-2026-1536x864.webp 1536w, https:\/\/www.ondara.group\/wp-content\/uploads\/2026\/11\/costes-construccion-obra-nueva-2026.webp 1680w\" sizes=\"auto, (max-width: 1680px) 100vw, 1680px\" \/><\/p>\n<p>Assume a development with a total cost of EUR 10 million: 3 for land, 6 for construction and 1 for other costs. It is financed with a loan of 65% of cost (EUR 6.5 million) and EUR 3.5 million of equity. The expected sales value of the completed homes is EUR 13 million. Let us see what happens if construction becomes more expensive.<\/p>\n<div class=\"tabla-seo\">\n<table>\n<caption>Illustrative example prepared by Ondara Group, November 2026 (EUR million; hypothetical assumptions)<\/caption>\n<thead>\n<tr>\n<th>Construction overrun<\/th>\n<th>Total cost<\/th>\n<th>Developer margin<\/th>\n<th>Loan \/ cost (LTC)<\/th>\n<th>Extra capital needed<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>0%<\/td>\n<td>10.0<\/td>\n<td>3.0 (30.0%)<\/td>\n<td>65.0%<\/td>\n<td>0<\/td>\n<\/tr>\n<tr>\n<td>+10%<\/td>\n<td>10.6<\/td>\n<td>2.4 (22.6%)<\/td>\n<td>61.3%<\/td>\n<td>0.6<\/td>\n<\/tr>\n<tr>\n<td>+15%<\/td>\n<td>10.9<\/td>\n<td>2.1 (19.3%)<\/td>\n<td>59.6%<\/td>\n<td>0.9<\/td>\n<\/tr>\n<tr>\n<td>+25%<\/td>\n<td>11.5<\/td>\n<td>1.5 (13.0%)<\/td>\n<td>56.5%<\/td>\n<td>1.5<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>Three takeaways from this hypothetical example:<\/p>\n<ul>\n<li><strong>The margin absorbs the hit first.<\/strong> A 25% construction overrun cuts the margin on cost from 30% to 13%. The project remains viable, but with less room to cope with a fall in prices.<\/li>\n<li><strong>The loan does not grow by itself.<\/strong> LTC falls because the loan is fixed while costs rise. That looks good for the lender, but only if someone provides the missing EUR 1.5 million. Otherwise the building is not completed.<\/li>\n<li><strong>A 5% contingency (EUR 0.3 million here) only covers part of it.<\/strong> At +10%, another EUR 0.3 million is needed; at +25%, EUR 1.2 million more.<\/li>\n<\/ul>\n<p>This example is illustrative and hypothetical, does not reflect any actual Ondara transaction and ignores interest, taxes and delays, which in practice would worsen the outcome.<\/p>\n<h2>How a deal can be protected against overruns<\/h2>\n<p>Overrun risk cannot be eliminated, but it can be contained. These are the usual tools in development finance:<\/p>\n<div class=\"tabla-seo\">\n<table>\n<caption>Source: Ondara Group, based on common market practice, November 2026<\/caption>\n<thead>\n<tr>\n<th>Tool<\/th>\n<th>What it does<\/th>\n<th>What to check<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Fixed-price construction contract<\/td>\n<td>Shifts much of the cost-increase risk to the contractor<\/td>\n<td>Price-revision clauses and contractor solvency<\/td>\n<\/tr>\n<tr>\n<td>Contingency line<\/td>\n<td>Buffer within the budget for unforeseen costs<\/td>\n<td>Its size and whether it has already been used<\/td>\n<\/tr>\n<tr>\n<td>Drawdowns against certified progress<\/td>\n<td>The loan is released as the works actually progress<\/td>\n<td>Who certifies and how often<\/td>\n<\/tr>\n<tr>\n<td>Independent project monitor<\/td>\n<td>External expert who tracks cost, timing and quality<\/td>\n<td>Independence and the lender&#8217;s access to its reports<\/td>\n<\/tr>\n<tr>\n<td>Developer cost-overrun undertaking<\/td>\n<td>Requires the developer to fund overruns with its own equity<\/td>\n<td>Real financial capacity to honour it<\/td>\n<\/tr>\n<tr>\n<td>Cost and timing covenants<\/td>\n<td>Allow action if the project goes off track<\/td>\n<td>Thresholds and consequences, as explained in <a href=\"https:\/\/www.ondara.group\/en\/covenants-real-estate-private-debt\/\">covenants in real estate private debt<\/a><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>Drawdowns against verified construction milestones are also the basis of the <a href=\"https:\/\/www.ondara.group\/en\/alternative-development-loan-spain\/\">alternative development loan<\/a>: money is not released before the works progress, which limits the lender&#8217;s exposure to a stalled site.<\/p>\n<h2>Questions to ask before investing in a development<\/h2>\n<ul>\n<li>Is the construction budget updated to 2026 prices, or was it drawn up one or two years ago?<\/li>\n<li>Is there a signed construction contract? Fixed price or with price revision?<\/li>\n<li>How large is the contingency and how much has already been used?<\/li>\n<li>Who pays if costs exceed the contingency? Does the developer have the real capacity to do so?<\/li>\n<li>What is the LTV on completed value and on current value?<\/li>\n<li>Is there an independent expert monitoring the works and reporting regularly?<\/li>\n<\/ul>\n<p>These questions are part of any <a href=\"https:\/\/www.ondara.group\/en\/private-real-estate-debt-due-diligence\/\">due diligence on private real estate debt<\/a>.<\/p>\n<h2>How we analyse it at Ondara<\/h2>\n<p>Ondara Group has worked since 2018 on real estate-secured financing. In deals involving construction, we review the budget and how up to date it is, the contract with the builder, the contingency line, the timetable and the developer&#8217;s capacity to inject funds if costs deviate. Each deal is analysed individually, with a real asset as collateral, and we aim to spread risk across different transactions. Investors deal directly with the management team and the minimum investment is EUR 25,000. You can learn more about us on our <a href=\"https:\/\/www.ondara.group\/en\/who-we-are\/\">who we are<\/a> page.<\/p>\n<p>We pursue target double-digit returns, always as a target and never guaranteed.<\/p>\n<h2>Risks to consider<\/h2>\n<ul>\n<li><strong>Loss of capital.<\/strong> All investments carry risk, including the partial or total loss of the capital invested.<\/li>\n<li><strong>Construction risk.<\/strong> Overruns, delays, problems with the contractor or with permits may affect loan repayment or the outcome of the project.<\/li>\n<li><strong>Market risk.<\/strong> If sales prices fall while costs rise, the margin can disappear.<\/li>\n<li><strong>Collateral mitigates, it does not eliminate.<\/strong> A half-finished building is harder to sell and to value; enforcing security can take time and the amount recovered may be lower than expected.<\/li>\n<li><strong>Illiquidity and term.<\/strong> Money usually cannot be recovered before maturity, and construction delays can extend the term.<\/li>\n<\/ul>\n<h2>Frequently asked questions<\/h2>\n<h3>What is a construction cost overrun?<\/h3>\n<p>It is the amount by which the actual cost of building exceeds the budget. It may be caused by higher material or labour costs, design changes, technical surprises or delays.<\/p>\n<h3>How much have construction costs risen in Spain?<\/h3>\n<p>It depends on the source and period: according to APCE data published in July 2026, building housing costs 25.1% more than in 2019; the PwC and Cuatrecasas Observatory puts the increase at 48.3% between 2018 and 2025. Construction labour costs rose 5.0% year on year in Q2 2026, according to INE.<\/p>\n<h3>Who pays for overruns in a development?<\/h3>\n<p>First the contingency line and then, usually, the developer with its own equity. Under a fixed-price construction contract, part of the risk sits with the contractor. The lender only increases the loan if it agrees to do so.<\/p>\n<h3>What is LTC and how does it differ from LTV?<\/h3>\n<p>LTC compares the loan with the total cost of the project; LTV compares it with the value of the property. In developments, both are usually monitored.<\/p>\n<h3>Can I invest in developments if I am concerned about overruns?<\/h3>\n<p>It is a personal decision best analysed with a professional. What matters is understanding how each deal is protected against cost and timing deviations, and not concentrating too much capital in a single project.<\/p>\n<h2>In summary<\/h2>\n<ul>\n<li>Construction costs in Spain keep rising faster than consumer prices, and labour costs in the sector are growing above the national average.<\/li>\n<li>Overruns first reduce the developer&#8217;s margin and can leave the financing short if nobody funds the gap.<\/li>\n<li>In the illustrative example, a 25% construction overrun cuts the margin from 30% to 13% and requires EUR 1.5 million of extra capital.<\/li>\n<li>Fixed-price contracts, contingencies, drawdowns against certified progress and independent monitoring help contain the risk.<\/li>\n<li>All investments carry risk, including loss of capital, and real estate collateral does not eliminate it.<\/li>\n<\/ul>\n<p>If you would like to know how we invest, <strong><a href=\"https:\/\/www.ondara.group\/en\/investors\/\">register as an investor<\/a><\/strong> and we will explain how it works. The minimum investment is EUR 25,000.<\/p>\n<p><em>This article is for information purposes only and does not constitute an investment recommendation or financial advice. All investments carry risks, including the possible loss of the capital invested, and past or target returns do not guarantee future returns. Analyse each opportunity with a professional before investing.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Construction cost overruns in real estate development: 2026 cost data for Spain, an illustrative example and what investors should check before investing.<\/p>\n","protected":false},"author":1,"featured_media":5343,"comment_status":"","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[21,24],"tags":[],"class_list":["post-5350","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-direct-lending","category-real-estate"],"_links":{"self":[{"href":"https:\/\/www.ondara.group\/en\/wp-json\/wp\/v2\/posts\/5350","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ondara.group\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ondara.group\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ondara.group\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ondara.group\/en\/wp-json\/wp\/v2\/comments?post=5350"}],"version-history":[{"count":0,"href":"https:\/\/www.ondara.group\/en\/wp-json\/wp\/v2\/posts\/5350\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ondara.group\/en\/wp-json\/wp\/v2\/media\/5343"}],"wp:attachment":[{"href":"https:\/\/www.ondara.group\/en\/wp-json\/wp\/v2\/media?parent=5350"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ondara.group\/en\/wp-json\/wp\/v2\/categories?post=5350"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ondara.group\/en\/wp-json\/wp\/v2\/tags?post=5350"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}